Previous Lesson Complete and Continue  

  You are trying to perform some data loads using Snowpipe, the load is taking longer than excepted so you stopped the existing load and increased the size of Virtual Warehouse to X-Large, when you restart the load does the load resume from the point where it was last stopped?

Lesson content locked
If you're already enrolled, you'll need to login.
Enroll in Course to Unlock